Skip to content Skip to footer

Project Risti

Phase 1

180 MW

Zoned area

360,000 m²

Ownership

50%

Location

Risti, Estonia

A data center campus in Risti, western Estonia — 60 km south of Tallinn.

Magnora Data Center (‘MDATA’) develops the Risti Kampus data center project together with its 50/50 joint venture partner Sunly AS, a leading energy infrastructure company. The joint venture was established in September 2026 and the owners apply their respective capabilities to effectively develop the project according to environmental, regulatory and market requirements. MDATA holds an option to increase its owner share to 75%.

The campus can be connected to the power grid and to Sunly’s adjacent energy park, with 244 MWp solar, 144 MW battery storage and 44 MW wind in development.

The data center is being designed for closed-loop cooling. This means that water consumption for cooling during operation is eliminated.

Status

Land secured

Grid connection established

Direct connection to Sunly's energy park

Initial campus masterplan completed

Zoning

Capacity build-out

Six planned data center modules of up to 30 MW each, with room to expand beyond the initial footprint.

Location

Phase 1
180 MW

Expansion
Up to 400 MW

Modules
6 × 30 MW

Example of layout

Western Estonia, close to Tallinn and with direct fiber routes to Helsinki.

Green: subsea cable · Blue: terrestrial link, operational · Yellow: terrestrial link, under construction. Source: ITU / TeleGeography.

Tallinn

~60 km

Helsinki

~150 km

Latency to Helsinki

< 5 ms round-trip

Fiber

EstWin and two Tele2 cables

Partner: Sunly

Sunly is an Estonian renewables developer and power producer with solar, wind and storage projects across the Baltics and Poland. It is one of the leading developers in the Baltics.

Sunly’s Risti energy park lies right next to the campus. Its 244 MWp solar plant, due online in 2026, will be the largest in Estonia, with a 144 MW battery planned for 2027 and wind in development. The campus can combine grid power with direct access to the park.

244 MWp

Solar

144 MW

Battery Storage

44 MW

Wind in development